1, traffic: Plot adjacent to the Yu neighbor high speed, to reach the plot, there is a car passable width of 5.2 m dual lane cement hardened road, a total length of 3.6 km, motorbike can run 1.2 m pedestrian cement road, total length 1 km, traffic infrastructure has formed a network, stay available, no longer put into infrastructure.2. Power up: Currently there are 220V, can build additional 380V power 3, water: water is abundant, currently in the plot has built 2 reservoirs.4, network: not currently open, if needed, can be opened.5, the government has approved, within the plot, there are 30 acres to build houses, do not have to go to the relevant department to apply again.
查看全部